NEWS News
PRODUCTS / Products
  • Release time: 2017 - 06 - 13
  • Release time: 2017 - 06 - 13
    基本参数
    Way to workSingle into a single, double transformation work online Range of applicationWidely used in government, finance, telecommunications, education, transportation, meteorology, radio and television, industrial and commercial tax, health care, energy, electric power and other industries The performance characteristics ofIntelligent battery management, powerful network management functions, etc. Double conversion on-line structural design, digital control technology, high input, output, power factor. Intelligent high speed DSP control, perfect the system performance and protectio...
  • Release time: 2017 - 06 - 13
    APC Back-UPS, 600 Watts / 1000 VA, 输入 230V / 输出 230V包含: 软线管理夹板, 用户手册标准交付周期: 通常现货供应输出功率容量:600 瓦数 / 1000 VA最大可配置功率:600 瓦数 / 1000 VA额定输出电压:230V输出频率(与主频率同步):50 Hz其它输出电压:220波峰因数3 : 1波形类型:正弦波逐步逼近输出连接(4) Chinese outlet (备用电池)输入额定输入电压:230V输入频率:45 - 55 Hz输入端子类型Australian/Chinese输出线长度:1.22米工作电压范围:165 - 266V其他输入电压:220输入断路器容量:7.0  A电池与运行时间电池型号免维护密封铅酸电池(悬浮电解液):防漏典型充电时间:20 小时RBC™ 数量:2运行时图表 浏览上面的运行时图表线来查看的运行时与负载比详情
    APC Back-UPS, 600 Watts / 1000 VA, 输入 230V / 输出 230V包含: 软线管理夹板, 用户手册标准交付周期: 通常现货供应输出功率容量:600 瓦数 / 1000 VA最大可配置功率:600 瓦数 / 1000 VA额定输出电压:230V输出频率(与主频率同步):50 Hz其它输出电压:220波峰因数3 : 1波形类型:正弦波逐步逼近输出连接(4) Chinese outlet (备用电池)输入额定输入电压:230V输入频率:45 - 55 Hz输入端子类型Australian/Chinese输出线长度:1.22米工作电压范围:165 - 266V其他输入电压:220输入断路器容量:7.0  A电池与运行时间电池型号免维护密封铅酸电池(悬浮电解液):防漏典型充电时间:20 小时RBC™ 数量:2运行时图表 浏览上面的运行时图表线来查看的运行时与负载比详情
CONTACT US

Sales Hotline:(020)38770496

Switchboard:(020) 38770496 

Fax:(020)38911751

China · Guangzhou · 

Address: Room 3604A, CITIC Plaza, No. 233 Tianhebei Road, Guangzhou

Beautiful saipan is the capital of the northern mariana islands, here year-round sunny, fresh air and clear water sand young, is the famous island tourist attractions in the world. It is not only a remarkable dive holy land (blue holes), white sand, blue sky island scenery infinite, also has many historic sites and tracks during world war ii.Late 2016, delteclt group staff review meeting was held in symbian degrees. Leffler just general manager meeting, puts forward the "change" is the theme of the conference, with change of thinking to consider problem, in the face of the market, fo...
Release time: 2017 - 03 - 27
Browse times: 65
Chengdu metro is an important part of traffic in chengdu. The chengdu metro co., LTD. Is responsible for the construction and planning of the chengdu metro operation co., LTD. Is responsible for the operation, service in chengdu in sichuan province. Chengdu subway since opening, the development speed is accelerated, strive to achieve opened several subway lines in 2020. Chengdu metro has become one of the most important way to travel to chengdu citizens, send passengers to 339 million times 2015, daily passenger flow by 929700 times, train punctuality rate 99.97%.In order to guarantee the...
Release time: 2016 - 10 - 09
Browse times: 89
Sinopec to its 2016 rooms UPS uninterruptible power supply centralized purchasing project tender announcement, delteclt Beijing successfully won the bid in the project company, Beijing company for petrochemical field power supply system provides a computer floor room UPS uninterruptible power supply system and power distribution cabinet. Successfully won the bid of the project, not only for the delteclt electronic equipment co., LTD., develops the market have a positive role, and show that in the professional technology, product quality, qualification authentication, after-sales service a...
Release time: 2016 - 09 - 22
Browse times: 136
Delteclt  in the New Year team to continue adhering to the concept of low system integrators to do the most professional and conscientiousness dedicated attitude, and strength of China unicom company to Shanghai in August and September 2016 consecutive winning (SCP) of Thailand and Malaysia (BPC) complete sets of low-voltage system, SCP and BPC project belong to large international listed companies, the project management, equipment selection and supplier qualification have strict management requirements. This project won the bid, the strength of China unicom is relies on our professional...
Release time: 2016 - 09 - 12
Browse times: 171
On August 12, 2016, the day,delteclt electronic equipment co., LTD., the company ushered in the mid - 2016 meeting in Beijing, Beijing together all the members in the company is known as "the home of the source of water, cloud, flower world, ocean, Lin leisure vacation paradise" the mulan paddock.Early in the morning on August 12, the day has just bright, all members have been ready, in the highway on the way, we have experienced the baptism of the pouring rain. Can not help but let's travel the mood had some ups and downs, but when we arrived at a surname tuen after service area, al...
Release time: 2016 - 08 - 23
Browse times: 36
On August 6, delteclt electronic equipment co., LTD., Shanghai company all my colleagues came to male, strange, risks, is famous around the world show, known as "KuangLu under well enjoys" the reputation of lushan, summing-up meeting held a year. Summary in the first half of 2016 work, emphasizing the deployment in the second half of the key tasks and responsibilities. Shanghai regional manager Guo Jingli chaired the meeting and delivered a speech, mr.wong, the general manager of our company to attend the meeting and delivered a speech.At the meeting, each department colleagues aroun...
Release time: 2016 - 08 - 09
Browse times: 45
In order to increase the cohesion of employees, reflect the human-based management of the company, can in the journey to relax at the same time to do a comprehensive summary in the first half of the work, on July 21, 2016 - July 24, delteclt chengdu company staff at mr.wong lead down to four girls mountain in aba Tibetan and qiang autonomous prefecture, sichuan province.Laughter all the way with beauty, starting at noon on the day we arrived in the beauty of the four girls mountain, in the cat's nose is much appreciate the "girl" is stand.Of course, beauty is beauty, mid year me...
Release time: 2016 - 07 - 27
Browse times: 59
In July, it is summer, the most you can think of is the sunshine and the beach. Delteclt guangzhou branch of the staff came to located in China's southernmost province, hainan 2016 years summary meeting.At the meeting, all the staff take turns to speak for themselves in the first half of 2016 main job summary, find out the deficiencies of their work, and in the second half of the work plan, and make analysis of the company's existing problem and put forward the proposal. Every one of them actively, on the meeting.Each department employees to speak after Guo mangamer and manager wang ...
Release time: 2016 - 07 - 13
Browse times: 58
In June 2016, delteclt guangzhou branch engineers completed the mead Johnson data room project. The project of equipment using the APC whole machine room of the British system, the engineering team with their rich experience and professional knowledge, a month, successfully completed the project, highly praised by users.The mead Johnson data room to install the system, is the latest edition of schneider APC company British flying system, a new generation of the fly system effective UPS, air conditioners and whole machine room monitoring mainframe will be integrated in one unit, and through the...
Release time: 2016 - 06 - 27
Browse times: 49
Copyright ©2005 - 2013 广州市劲达联通电子设备有限公司
犀牛云提供企业云服务