NEWS News
PRODUCTS / Products
  • Release time: 2017 - 06 - 13
  • Release time: 2017 - 06 - 13
    基本参数
    Way to workSingle into a single, double transformation work online Range of applicationWidely used in government, finance, telecommunications, education, transportation, meteorology, radio and television, industrial and commercial tax, health care, energy, electric power and other industries The performance characteristics ofIntelligent battery management, powerful network management functions, etc. Double conversion on-line structural design, digital control technology, high input, output, power factor. Intelligent high speed DSP control, perfect the system performance and protectio...
  • Release time: 2017 - 06 - 13
    APC Back-UPS, 600 Watts / 1000 VA, 输入 230V / 输出 230V包含: 软线管理夹板, 用户手册标准交付周期: 通常现货供应输出功率容量:600 瓦数 / 1000 VA最大可配置功率:600 瓦数 / 1000 VA额定输出电压:230V输出频率(与主频率同步):50 Hz其它输出电压:220波峰因数3 : 1波形类型:正弦波逐步逼近输出连接(4) Chinese outlet (备用电池)输入额定输入电压:230V输入频率:45 - 55 Hz输入端子类型Australian/Chinese输出线长度:1.22米工作电压范围:165 - 266V其他输入电压:220输入断路器容量:7.0  A电池与运行时间电池型号免维护密封铅酸电池(悬浮电解液):防漏典型充电时间:20 小时RBC™ 数量:2运行时图表 浏览上面的运行时图表线来查看的运行时与负载比详情
    APC Back-UPS, 600 Watts / 1000 VA, 输入 230V / 输出 230V包含: 软线管理夹板, 用户手册标准交付周期: 通常现货供应输出功率容量:600 瓦数 / 1000 VA最大可配置功率:600 瓦数 / 1000 VA额定输出电压:230V输出频率(与主频率同步):50 Hz其它输出电压:220波峰因数3 : 1波形类型:正弦波逐步逼近输出连接(4) Chinese outlet (备用电池)输入额定输入电压:230V输入频率:45 - 55 Hz输入端子类型Australian/Chinese输出线长度:1.22米工作电压范围:165 - 266V其他输入电压:220输入断路器容量:7.0  A电池与运行时间电池型号免维护密封铅酸电池(悬浮电解液):防漏典型充电时间:20 小时RBC™ 数量:2运行时图表 浏览上面的运行时图表线来查看的运行时与负载比详情
CONTACT US

Sales Hotline:(020)38770496

Switchboard:(020) 38770496 

Fax:(020)38911751

China · Guangzhou · 

Address: Room 3604A, CITIC Plaza, No. 233 Tianhebei Road, Guangzhou

On December 17, 2011, delteclt in 2011 annual work summary of the meeting was held in guilin. Company staff attended the meeting, summarize and review the past year with the achievements and deficiencies, and a year of work for the future direction and goal for further discussion.Meeting by the company general manager Mr Leffler just to speak first, in 2011 our company departments work, carries on the summary report to the company the work of each department performance evaluation and performance, and the prospects of the company in 2012 plan, the company's existing system and organizational s...
Release time: 2011 - 12 - 29
Browse times: 20
In 2011 June DELTECLT company in Beijing with the gold coast of Changli BTV training center has launched 2011 yearsummary conference. All employees to attend the meetings of the general manager of DELTECLT, who chaired the meeting, the conference is main content includes the company first half of the year work summary, departmental staff are also respectively for their first half of the year to sum up the work, and in the second half of the work plan of.&#...
Release time: 2011 - 08 - 03
Browse times: 22
DCLT holds the annual summing-up meeting on 15th Sep., 2006 in Zhangjiajie, Hunan. The leaders of all departments in the company take part in the meeting. All branches and departments of the company summarize the experience & lessons in the company’s development in recent years, the whole developing strategy route and developing direction in future via this meeting.       In recent years, the company is always in line with the developing policy “selling high-tech product, providing professional service”; endeavor to build the company an excellen...
Release time: 2010 - 12 - 30
Browse times: 15
The 2006 midyear summing-up meeting of Guangzhou Delteclt Electronic Equipment Co., Ltd. opens on 15th July in Nanhai, Foshan, and the staff from DCLT Guangzhou branch attends this meeting. In the meeting, the working progress and the problems existed in the first half of 2006 have been summarized, besides, the working tasks in the second half of 2006 have been made out preliminarily.
Release time: 2017 - 07 - 10
Browse times: 19
In 2002 July, American POWERWARE company held in Guangzhou POWERWARE UPS technical training and technicalcertification exam, my company sales department, engineering department personnel to pass the examination and obtain certification.
Release time: 2017 - 07 - 10
Browse times: 21
The meeting lasts for two days. There are 7 reports after the opening ceremony; the General Manager of DCLT makes the first reports. The UPS products technical training & technical exchange meeting is held by Delteclt Electronic Equipment Co., Ltd., and the itinerary arrangements are consigned to China Youth Travel Service-Guangdong.
Release time: 2017 - 07 - 10
Browse times: 29
Recently, diversified industrial products manufacturer Eaton corporation was invited to attend the "BBS of China green industry science and technology development" held in Beijing. Its star product 9395 series UPS won the "best green data center solutions" and "best communication power supply energy saving application of innovative solutions" two awards, fully affirmed the Eaton in green communication construction and energy saving innovation made outstanding contributions.The BBS sponsored by the China communication industry association, Chinese electric power ne...
Release time: 2017 - 08 - 10
Browse times: 11
Diversified industrial products manufacturer Eaton, always adhere to the strategy of sustainable development as the core of business development, has developed a number of energy conservation and environmental protection products and technology, is committed to content in China and global market growing demand for energy conservation and emissions reduction. Follow the fusion of Eaton Eaton localization development process is also increasingly mature, with the Eaton Eaton "green" logo 9395 ups products, in the effective use of resources, reduce environmental pollution condition, for ...
Release time: 2017 - 08 - 10
Browse times: 31
After the annual meeting of the various branches, the Shanghai company has held annual meeting in huangshan. It is difficult to go to the sky. Huangshan is no less difficult than shu dao, but the leaders and colleagues have happily ended the journey of huangshan with mutual help and encouragement. Meeting begins, all colleagues have speech: in the first half of their work, looking forward to in the second half of the work, in their work flaws in my self-criticism and listen to your advice! During the meeting, colleagues warmly discussed the problems encountered during the first half of the yea...
Release time: 2017 - 07 - 28
Browse times: 18
Copyright ©2005 - 2013 广州市劲达联通电子设备有限公司
犀牛云提供企业云服务